If the actual information at the lifting site does not tally with the lifting plan, you should stop the operation until the plan has been updated and re-approved.You should never deviate or vary from the approved lifting plan.Sketch of the lifting zone (showing position of lifting equipment, crew and load) and.Requirements to erect or dismantle lifting equipment (if any).Lifting crew (including their roles and competencies).Your lifting plan should include, but not limited to, the following elements: load capacity chart, range diagram, rigging method)įor complex lifts, additional engineering design efforts are necessary to ensure that the lifting operation is conducted safely. Safe work procedure or method statement.Lifting plan supported by a risk assessment (RA).For example, a lifting plan would ensure that the crane is safely deployed and operated, and the lifting crew are clear about their roles and responsibilities.īefore you start any lifting operation, you must prepare the following: The operation will be carried out in accordance with the following Legislation & Approved Codes of Practice. A lifting plan provides a systematic approach towards planning a lift and ensures that the lifting operation is properly managed. A Job Safety and Environment Analysis / Safe Work Method Statement Template (TEM-00013) is used to document this risk assessment. 1.1 It is the aim of this Method Statement to define and describe the equipment and safety procedures which are to be employed by the crane lifting company to carry out the lifting operation.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |